Tunnel Construction & Surface Points
GEO monitored an existing train tunnel as work proceeded on a new sewer tunnel. The AMTS in the photo was monitoring surface points, while another AMTS was monitoring within the tunnel.
Other instrumentation included shape arrays, piezometers, extensometers, and automated vibration monitors.