GEO-Instruments monitors new construction, repairs, renovations, and expansions. Instrumentation is deployed to provide early detection of problems and assist construction sequences. Datasheet
Monitoring Structural Renovations, Repairs, and Expansions
AMTS systems monitor prisms on interior and exterior walls to detect unexpected movement, such as tilting and settlement.
Crackmeters monitor existing cracks in walls and floor slabs.
Jointmeters monitor misalignment of incoming utilities or separation of expansion joints.
Hydrostatic levels, installed on floors and exterior or interior walls, monitor differential settlement.
Tiltmeters monitor deformation of walls and floors and lateral displacement of columns.
Laser distance meters monitor wall-to-wall or floor-to-ceiling convergence.
Strain gauges monitor changes in loads on steel structural elements.
Vibration monitors warn when vibration limits are exceeded.
Related Applications
GeoCloud Automation operates 24/7 to deliver measurements from the project work site to secure project web sites. GeoCloud automation features wireless data acquisition, web-based data management, and website access to alerts, graphs, and reports.
I-375 Settlement Monitoring
Monitoring I-375 for Settlement I-375 was closed for two nights to allow installation of the instruments. Four AMTS units provided…
West Point CEAC
West Point CEAC West Point Military Academy is adding a Cyber & Engineering Academic Center as seen in this architect’s…
MSE Wall Repair
MSE Wall Repair Project Overview Keller was called in to stabilize and repair a failed MSE wall. The wall supported…
Seatac Utility Upgrade
Seatac Utility Upgrade Project A utility upgrade project at SeaTac’s north terminal required excavations adjacent and below the departure ramp…
Med Center Expansion
Med Center Expansion Project: Providence Tarzana Medical Center is undergoing a 540 million dollar upgrade and enhancement that involves removal…
Tampa Airport
Tampa Airport Expansion Project Tampa International Airport’s $2 billion expansion plan will allow the airport to serve a projected 34…
Pedestrian Bridge
Ballston Pedestrian Bridge The Project The redevelopment plan for Ballston Quarter, the commercial center of Arlington, Virginia, included a new…
Storage Facility
Settlement of Storage Facility Project This tilt-up constructed storage facility experienced cracks, settlement, and movement of walls. Monitoring Requirement: Monitoring…